Motorised Systems
Access, surveillance, alerting and physical security, specified against the property.
Answer
What this system does
Covers powered systems outside the main security categories — louvres and pergolas, motorised curtains and blinds, sliding partitions and doors, and other installations where something moves under powered control.
Applications
Typical applications
- Motorised louvres and pergolas
- Powered curtains and blinds
- Sliding partitions and large doors
- Any opening operated frequently enough to justify automation
- Replacing a failed motor on an existing installation
Property types: Villa · House · Hotel or resort · Shop or office · Apartment building
Options
System options
| What decides it | |
|---|---|
| What moves | Weight, size and how it is supported |
| How often | Occasional or several times daily - this is duty |
| Power | Whether a supply exists where the motor goes |
| Control | Remote, switch, app, or automated by condition |
| Override | What happens when power fails |
Site
What the site decides
Measurements
- Opening or run width, with the unit
- Height or drop, with the unit
- Approximate weight of what moves, if known
- Space available for the motor and mechanism
- Distance to the nearest suitable power point
Power
A supply is needed where the motor is fitted. On retrofits into finished buildings this is often the constraint that shapes the whole job.
Network
Only where app control or automation by condition is wanted. Many installations work perfectly with a remote and a wall switch.
Backup
Consider what happens when the power fails, particularly where the system covers an opening that may need to be operated during an outage.
Controls
Remote, wall switch, app, or automation by time or sensor. More control methods means more to configure and hand over.
Compatibility
Where a motor is being replaced, the existing model and the mechanism condition both matter. A mechanism that binds will shorten any motor.
Safety
Safety considerations
Anything that moves under power and could trap a person needs appropriate safety devices and force settings. That applies as much to a large sliding panel as to a gate.
Existing systems
Replacing or extending
Photograph the existing motor and plate, the mechanism, and the control position.
Expansion: Additional controls or automation can usually be added within the limits of the system chosen.
Prepare
What to photograph
- The whole installation, from a few steps back
- The mechanism and how it is supported
- Any existing motor, with its plate
- The control position
- The nearest power point
What may be enough initially: Photographs plus dimensions and an approximate weight can support preliminary guidance on a straightforward installation.
Plan it
Record your site requirement
The planner records the measurements and site conditions above, and adds them to your requirement.
Cost
What affects the price
- What is being moved, and its weight
- Span or drop
- Duty expected
- Whether power exists at the position
- Control methods
- Safety devices
- Any structural or civil work needed
Time
What affects the time
- System size and device count
- Site complexity and cable routes
- Whether a survey is needed first
- Equipment availability for the specification chosen
- Power and network work needed beforehand
- Site access and permitted working hours
- Approvals where a building or association requires them
What can delay installation
- Power or network not ready at the positions agreed
- Access to the site or to working areas
- A specification change after survey
- Civil or structural work needed for mounting or cable routes
- Equipment availability for a specific configuration
Scope
Specification and quotation
What a specification includes
- The devices and where each one goes
- Cabling and containment
- Power and network provision required
- Controls and how the system is operated
- Configuration and handover as quoted
- Anything excluded, stated plainly
What is confirmed at quotation
- Final device selection against site conditions
- Cable routes and quantities
- Any civil or electrical work needed
- Installation scope and working arrangement
- Applicable warranty, commissioning, support and after-sales arrangements
- Price and timing
Process
How it runs
- Initial requirement. What the system needs to do, and where.
- Photographs and measurements. Recorded with the planners.
- Preliminary guidance where appropriate. Indicative only.
- Site survey where required. Power, network, mounting positions and cable routes.
- Final specification. Equipment selected against real conditions.
- Final quotation. Then approval, installation and handover.
Avoid
Common mistakes
- Selecting a motor before weight and span are known
- Automating a mechanism that already binds
- Assuming power is available at the motor position
- Leaving no accessible override
Questions
Frequently asked
Can any existing system be motorised?
Not automatically. The mechanism has to move freely, the structure has to support the motor, and power has to reach the position. All three are checked at survey.